  • The Documents Required for availing the services/Needed Compliances
  • Consent/Authorization/Registrations Granted by MPPCB (as applicable)
    • Consent to Establish (under Water Act 1974 & Air Act 1981).
    • Consent to Operate (under Water Act 1974 & Air Act 1981).
    • Authorization under Hazardous Waste Rules 2016.
    • Authorization under Bio-Medical Waste Management Rule, 2016.
    • Authorization under Plastic Waste Management (Second Amendment) Rules, 2022.(Apply in EPR Portal https://eprplastic.cpcb.gov.in)
    • Authorization under E-Waste (Management) Rules, 2022.(Apply in EPR Portal https://eprewastecpcb.in)
    • Authorization under Solid Waste Management Rules, 2016.
    • Authorization under C&D Waste Management Rules, 2016.
    • Registration of Battery Waste Management Rules, 2022.(Apply in EPR Portal http://www.eprbatterycpcb.in)
  • Consent to Establish (CTE) under Water Act 1974 & Air Act 1981.
    • Land allotment letter/land allotment LOI/Land possession documents.
    • Layout plan of the project/industry.
    • Project report including complete details of manufacturing process with material balance / Raw Materials.
    • Proposed Gross capital investment in Land/Building & Plant/machinery etc/Project cost (Fixed assets)/Self Certificate.
    • NOC of Gram Sabha / Local body.
    • Article of Association memorandum of under standing .
    • Copy of Environmental Clearance (If any)
    • DIC / SIA / DGTD / Udyam Aadhaar / Mining lease / Conceptual Plan (In case of Building /Infrastructure project) etc.
    • Satellite imagery of project / industry site.
    • Proposal of Effluent/Sewage Treatment Plant
    • Detailed Design Drawing (Technical Report ) of ETP/STP
    • Permission of CGWA (If applicable)
    • Proposal along with Technical Specification of Air Pollution Control Arrangements.
    • Schematic Diagram of Monitoring Facility (Port Hole & Plate form with Spiral ladder).
    • List of Chemicals/ auxillary chemicals consumption per month.
    • List of proposed hazardous waste generation (if any)
  • Consent to Operate & Renewal of Consent (CTO/Renewal) under Water Act 1974 & Air Act 1981.
    • Point wise compliance of conditions given in letter of CTE/CTO along with photographs
    • Latest CA Certificate/ audited balace sheet showing actual gross capital investment (Fixed assets) in Land, Building & plant/machinery etc (without depreciation)
    • Technical Details of ETP/STP installed along with photographs
    • Technical Details of Air Pollution Control Measures installed along with photographs
    • Copy of Environmental Clearance (If any) with compliance of conditions
    • Environmental statement (In case of renewal/Expansion).
    • Annual Return of Hazardous waste in Form-4
    • Latest Treated waste water analysis reports (In case of renewal/ Expansion)
    • Latest Emission analysis reports (In case of renewal/ Expansion).
  • Authorization under Hazardous Waste Rules 2016.
    • Annual Return of Hazardous waste in Form-4 (In case of renewal/expansion) along with Manifest (Form-10)
    • List of hazardous waste generation along with category & quantity
    • Point wise compliance of authorizations conditions (In case of renewal/Expansion)
    • Details of SLF/Incinerator (If applicable)
  • Authorization under Bio-Medical Waste Management Rule, 2016.
    • Technical Report on ETP/STP.
    • Point wise compliance of authorizations conditions (In case of renewal/Expansion)
    • Form – 4 (Annual Report) (In case of renewal/Expansion)
    • Membership certificate of CBWTF
  • Documents Required for Registration under Plastic Waste Management (Second Amendment) Rules, 2022
    • The services are provided by CPCB, for more details click here
  • Documents Required for Authorization under E-Waste (Management) Rules, 2022
    • The services are provided by CPCB, for more details click here
  • Documents Required for Authorization under Solid Waste Management Rules, 2016
    • Technical report on Segregation, collection, transportation of MSW.
    • Technical report on processing/treatment of Wet wastes/Dry wastes/Domestic HW.
    • Point wise compliance of authorizations conditions (In case of renewal/Expansion)
    • Form – 4 (Annual Report)
  • Documents Required for Authorization under Construction & Demolition waste Management Rules 2016
    • Technical report on Collection, Storage, Processing or recycling facilities for C&D waste.
    • Point wise compliance of authorizations conditions (In case of renewal/Expansion)
    • Form – 2 (Annual Report)
  • Documents Required for Registration under Battery Waste Management Rules, 2022.
    • The services are provided by CPCB, for more details click here